Obtaining the budget contingency reserve through the monte carlo method: Study of a ferry construction project

  1. Para-González, L.
  2. Mascaraque-Ramírez, C.
  3. Madrid, A.E.
Revue:
Brodogradnja

ISSN: 0007-215X

Année de publication: 2018

Volumen: 69

Número: 3

Pages: 79-95

Type: Article

DOI: 10.21278/BROD69305 GOOGLE SCHOLAR lock_openAccès ouvert editor