Obtaining the budget contingency reserve through the monte carlo method: Study of a ferry construction project

  1. Para-González, L.
  2. Mascaraque-Ramírez, C.
  3. Madrid, A.E.
Revista:
Brodogradnja

ISSN: 0007-215X

Ano de publicación: 2018

Volume: 69

Número: 3

Páxinas: 79-95

Tipo: Artigo

DOI: 10.21278/BROD69305 GOOGLE SCHOLAR lock_openAcceso aberto editor HANDLE: https://hdl.handle.net/10481/94634